WSI executed rapid-response coke drum repairs, addressing through-wall cracking with advanced welding, parallel operations, and zero incidents, minimizing downtime and preventing costly unplanned shutdown.
During the mill’s outage, WSI restored the 1984 batch digester with precision weld overlay, strengthened reliability, and delivered zero incidents despite shifting schedules and remote conditions.
During the site’s largest turnaround, WSI’s automated welding systems restored coke drum integrity, improved reliability, and achieved zero incidents despite severe seasonal challenges.